After another contractor left me out to dry by increasing his price for leveling the floor by 5X (from 7 to 35 bags plus over a $1000 extra in labour) and delaying the project by two weeks, I called Lucas, who was out of town at the time, and he he gave me a quote over the phone.
He started work within two days because he knew I was in a time crunch.
It was a lot of work. They had to grind down a huge hump in the middle of the floor and it took them days. They were at it for three full days. Then they poured and got me a subfloor that is perfect and smooth.
Lucas and his crew were dedicated, meticulous, and very skilled. They went above and beyond in all ways.
I can't praise them enough.