We had our bathroom upstairs renovated completely (September 2011). The job was done and paid for. However, on November 10, 2011 we had a huge leak on our main floor - the water was leaking through the light fixture on the main floor during taking a shower upstairs. The renovation company was advised, sent someone to fix it (November 11, 2011), 2 days after fixing (on November 13, 2011) it started to leak again from the same spot. They came to fix it second time. Of course, there was some damage done to our ceiling and painting on the wall on the main floor. Also, the wooden door frame to our living room on the main floor was damaged by water. Edison said they will take care of the damage. When the second fixing was done, they stared to fix the water spots on the ceiling (painted the spot white colour, which was OK), the wall paint which was damaged above the door frame to the living room was re-painted with primer only and left it like this till today. Our original colour is not white... Edison was advised again, we left him 2 messages (November 19, and November 20, 2011) however, suddenly he never responded to our messages, never picked up the phone. He even has not found the time to come to our house and inspect the damage... Looks like he will never return to fix the damage...we are very unsatisfied with his services...