Is this your business? Receive leads and respond to reviews. Claiming is easy and free. Claim this business

Palac Contracting

General Contractors
Toronto ON M5A 2T2
Write a Review
Write a Review

HomeStars  >  Basement Renovation in Toronto  >  Palac Contracting  >  bathroom makeover and basement refinishing
Mortalkombat  Waterloo
Mortalkombat Waterloo
1 review Toronto, ON
1/10

bathroom makeover and basement refinishing

I hired Palac contracting to finish the taping and mud for the work that was done in my basement. Mike came and gave me two quotes 1 for the taping, finshing and painting of 2500 + 3500 for a refaceing of the bathroom which included ONLY re & re of the toilet, shower and vanity and fixing the plumbing. Once the shower was removed I had authorised a complete redo of the basement washroom which was then quoted to me as being 8000.00. This along with the original quote of 2500 to finish the rest brings the quote to 10500. Having added some minor extras along the way the assumption on my part was perhaps adding another 2-2500 in additional costs thereby bringing the value to no more then 13000. After having worked with less then a full crew for two weeks it was time for xmas and new years. The contractor failed to show up on January 2nd- however did show up on January 7th at which point a funny turn of events occured. This contractor decided he needed to review his initial quote with me and then denied having quoted me 2500 but instead insisted it was 12500. After the disagreement the contractor having taken two draws of $5000 each walked off the job leaving me with perhaps less then 8000 worth of work done. My washroom is not even back together nor is the kitchen in place nor are the walls painted. Too cocky for hiw own good and will be pursuing this matter through the courts as contractor reneged on his own words.

Approximate cost of services:
$13,000.00
What could this company do to improve their services?
Any advice to offer fellow homeowners facing a similar project?
Was this review helpful?