Our small kitchen renovation was planned to be completed in 3o days by project manager Ivan Muis and it took 2 months to complete, causing us with great inconvenience, without use of kitchen for 2 months. Design was great done by designer in out house with 3D model for us to see and choose fixtures and colours with out leaving home. The cabinet manager Moe made a bad measurement mistake, and the dishwasher door would not open unless the cabinet drawers are moved to face outward of the kitchen instead of inwards. Imagine every time we need to get knife and forks we have to move to the other side of the counter to open the drawers facing outside? Project manager Ivan Muis mentioned he will try get us some compensation but we never heard back from them. Demo and counter top manager Nataly did a great job for us. Counter top technician also did a great job. Engineer Vadym did great job for us too but he forgot to turn on the water supply for us after connecting the dishwasher and so the detergent pod does not eject and dishes not washed. We had to hire a appliance technician for $75 plus tax and he found the water outlet was not turned on.
- Approximate cost of services:
- $25,000.00