The majority of the work was tiling which was difficult due to the type of tiles we chose as they were intricate. The size of tiles varried from large to small, rectangular to hexagonal, wood plank to river rock (which also made grouting difficult). My contractors also performed installation of the infloor heating and schluter accessories in whistler bath, shower and drywall water proofing.