- Approximate cost of services:
- $300,000.00
Great experience with this contractor on several projects
Framing and sistering of joysts
Great review , I don't perform the work as i am a general contractor and do not perform the work, i was onsite everyday threw out the project and my guys can confirm. the client was never onsite.
sandy ripped us off $4,000,00 out standing balance and still is to pay.
0 star review wow and you owe us $4,000.00.
Also i reffered my plumber Marcus whom commenced work and Sandy ripped off and to present owes him out standing balance of $1,500.00
Pathetic Sandy
Home addition and kitchen renovation
Thank you very much for taking the time to add a review. We appreciate it.
Thanks for the review and was a pleasure working with you guys
Garnet hired Bloor west construction to provide drawings and permits to commence 3 deck enclosures and a front porch roof with a new concrete pad.
Bloor west construction hired architect and engineering services to provide 3 sets of drawings and all city application fee's, review fee's, submission fee's, taxes fully paid the parties involved.
The client had 1% lot coverage left and 1% GFA left which in turn the permits where declined by the city and the next step was to go to the committee of adjustments which extra fee's where required to be paid by the client.
The client declined the unforeseen extra costs and then demands all his money back and tells us he will goto to committee him self and very obtain the permit with all the back end work commenced and inn his hand.
Contractors beware and stay far away from this guy is pathetic , running a illegal church for income out off his garage no permit and his tear down house so outta code he could never afford too catch up .
Sept 11: site visit and informing the client of the conditions of the house
and the fact that project will potential trigger CofA. We recommended to
apply for a zoning certificate rather than a full permit in order to save
them some money in case they had to go to CofA and they wanted to halt the
project there.
Sept 13: project details were finalized through email communications with
Jeff, Garnet and Nila
Sept 21: zoning set was issued for review
Sept 25: client reminded on two occasions that their application will most
likely require CofA and we are trying to minimize their risk of going to
CofA by changing the proposal to two roofs and that the risk of CofA is
still there
Sept 26: project submitted
Oct 15: zoning comments came back and due to the existing conditions of the
building setbacks and the way examiner has interpreted their setbacks for
the new added roofs they will have to go to committee of adjustment. Client
requested our fees for the adjustments if they had to go forward with them
and we informed them that our contract is with Jeff and he can contact you
directly with regards to that.
Oct24-29: Garner sent out an impolite email trying to question our work.
Client requested that now that we have to go to CofA to change the proposal
and create and cover a main floor deck and create an enclosed front porch.
As per our contract:
Scope of Work: replacing second floor balconies and propose flat
roof. Garage concrete pad
***Following services are not part of the scope of this contract and
are available upon client
request/requirement: HVAC Design, Floor plans, 3D Modelling,
Renders, Committee of adjustment
planner/prep, shop drawing, tender drawing, Interior design***
***Following quote is subject to approval for zoning. ***
***Construction stage consultation, reviews and inspections outside
the scope outlined below are outside the
scope of this contract and will be quoted separately. ***
This required extra work which we quoted you for as following on Oct 29:
Also client requested the drawings and we informed them that we can either
try to drop them off on our way or he can pick them up during business
hours. He said there is no rush and we can drop them off at our convenience.
Nov 5: we did a follow up to see how things are coming along and you
informed us that you haven't heard back anything from the client yet.
Nov 12: you asked for the quote again and we forwarded the previous email
from Oct 29
Nov 13-21: Client got involved with you with regards to application
demanding that they had already instructed you to move forward. He also
tried to hold us guilty for not returning his drawings which is not our
responsibility by any means however we had one of our staff return them to
him by Nov 14
stay very far away from this GUY
Bloor west construction inc