We had a dated bathroom with a too-small tub, leaky tiles and converted kitchen cabinets for our vanity. Triangle Construction helped us design our new walk-in shower stall and select all the fixtures before beginning the work. They went from demolishing the existing room through to completion including laying tile throughout the shower and the remainder of the bathroom floor, and installing a new pot lights and all-new vanity, sink and toilet within two weeks. The team was polite, respectful of our space and cleaned up before they left each day. We love our new, modern bathroom!