The actual paving and work done on the driveway was really good. However they were very careless and sloppy with just about every other aspect of project.
1) Empty & half full coffee cups were left on my veranda
2). About a half dozen black circles and streaks on my lawn. The grass is dying in these spots. This is where they put their pails with diesel fuel so they can clean the asphalt off their shovels and other tools. The pails were put right on the grass and there was spillage. Nothing was used to cover and protect the grass
3) My garage door was left open and my sprinkler, attached to my hose in the garage, is missing. It’s fairly obvious they used my water and therefore my hose during the project
4) The yellow barrier tape was strung along the end of the driveway blocking access from the road and along only side of the driveway blocking access from the lawn. Not a big issue but still another example of cutting corners or not paying attention. If it was necessary to block one side of the driveway with yellow tape, why not the other
4) When they initially showed up to tear up the existing driveway, I was told to move my car off the driveway by 7:30 am. At 7:10 am there was a pounding on my door and when I opened it, one of the workers started yelling at me that my car was not moved yet.
5) About a month and a half wait between the time they tore up the existing asphalt and then came back and paved with the new asphalt