We have apologized for our timeliness due to internal staffing issues but also there were some health issues and surgeries on the clients’ side. They asked us not to return from Dec 2017 – March 2018 due to these surgeries. Not to mention once the demolition started we ran into our first obstacle; a concrete pad, which was covered in dirt about a 1’ to 18” below grade; approximately 24” thick by the width of the house. We also ran into bad weather during the summer months. As it relates to the eaves we did not want to make quick fixes but diligent ones with results when that did not occur we realized the problem may be bigger than originally thought. We attempted repairs on the eaves 4 different times with minor success each time; we would have returned as many times as necessary to complete the warranty issue.
Jackson took on thousands of dollars in Extra Work Orders to please the client; not charged to the client and paid for by the firm itself
• Windows and aluminum on old part of house
• Spray foam insulation in place of batt insulation
• Spray foam duct work for A/C unit
• We did double water proofing due to possible break down of exterior waterproofing
• Drainage for future interior water proofing in the basement
• 4x4 skylight put in, unit plus framing in place of size suggested
• Special scaffolding used between houses due to problems with neighbours (due to issues from the past)
• Landscape stairs, pad & retaining wall in place of concrete stairs, pad & retaining wall
• Exterior masonry foundation we were to parge, we did stucco to match the entire addition instead
• Supply and install stucco moulding around windows & door on the rear of the building, so it wouldn’t look so bland
• We leveled main floor & 2nd floor as close as possible as he wouldn’t pay for leveling
• Supply and install railing to the front porch so that job would pass building code inspection
• All inspections passed including building, plumbing & electrical
Jackson & Associates Inc. did take on multiple Extra work orders not included in the agreement but asked for by the client following the contract being drawn up therefor they knew they would be billed for extras not paid for out of Jackson’s kindness and willingness to compromise & make the client happy.