Kitchen Gut Renovation in Beach Semi
Having worked with Steadfast before for our bathroom renovation, we contracted them again to perform a kitchen gut renovation in a century-old semi in The Beach. Again, Mike and his team did a very good job. The project included: — Demolition and disposal of debris — Install a dust membrane to minimize dust migration — Frame all walls — Level floor and install plywood subfloor — Install insulation and vapour barrier in walls and under the floor — Install plumbing — Electrical: wire and install 6 pot-lights, 4 pendant lights, under-cabinet lights, 2 external lights, switches, hood fan — Install Schluter floor heating system with sensor and — Install tile floor — Work with a subcontractor who measured the kitchen, designed it on Ikea’s website, purchased and installed the cabinets. — Coordinate with third-party company that installed exterior sliding door — Install and paint drywall — Install ceramic backsplash — Supply and install quartz countertop — Lay bricks to cover old window AC unit — Clean up the site Project duration: ~6 weeks Mike was adaptable and amenable when it came to “surprises” that are inherent with century-old houses. The floor heating thermostat that came with the system was inadequate and Mike sent an electrician after the end of the project to install a new thermostat for no extra-cost. Similarly, we noticed that the external hood vent was making a loud noise when windy and Mike found a solution to tamper it after the end of the project. The team did a reasonable job at keeping the kitchen and surrounding area clean. Our only recommendation to future clients is to maintain constant and clear communication directly with Mike.
- Approximate cost of services:
- $0.00
- Company Response
Thank-you taking the time to write a review for us! It was great to be given the opportunity to work with you guys again.
Enjoy your new kitchen!
Mike